A £75m new build residential scheme to create 185 apartments across two blocks. Currently in tender expected to start on site Q2 2024

Key Features
  • M&P completed the Structural and Civil designs
  • Complicated flood mitigation measures being in Flood Zone 3
  • The superstructures are a combination of RC and steel frame
  • Structural arrangement selected to achieve a cost effective solution based on the appointed contractor's experience & resources.
Thameside House 5
Thameside House 6
Thameside House 8
Thameside House 3
Thameside House 1
Thameside House 7
Thameside House 9
Thameside House 10
Thameside House 2
Thameside House 4
Key Features:
  • M&P completed the Structural and Civil designs
  • Complicated flood mitigation measures being in Flood Zone 3
  • The superstructures are a combination of RC and steel frame
  • Structural arrangement selected to achieve a cost effective solution based on the appointed contractor's experience & resources.